/* ============================================================
   KERAUNOS COMPUTE — data (public positioning, multi-page)
   Qualitative. No named sites / MW / counterparties.
   ============================================================ */
window.KDATA = {

  /* hero slogans (home) ------------------------------------------ */
  slogans: {
    becomes:   { label: "Where power becomes compute." },
    powerup:   { label: "Built from the power up." },
    turn:      { label: "We turn power into compute." },
    source:    { label: "Compute, at the source." },
    bottleneck:{ label: "Power is the bottleneck. We own it." },
  },

  /* count-up stats (safe aggregates only) ------------------------ */
  counts: [
    { to: 10, suffix: "+", k: "Years operating", note: "energy-backed infrastructure" },
    { to: 3, suffix: "", k: "Countries", note: "Argentina · Brasil · Paraguay" },
    { to: 50, suffix: "%", k: "Lower energy cost", note: "vs. current compute hubs" },
    { to: 100, suffix: "%", k: "Renewable-anchored", note: "hydro · wind" },
  ],

  /* the vertical stack ------------------------------------------- */
  stack: [
    { n: "06", t: "Demand", d: "Capacity placed with the buyers who need power now.", tone: "accent", note: "compute side" },
    { n: "05", t: "Compute", d: "GPU clusters, high-bandwidth fabric & a managed cloud platform.", tone: "accent", note: "compute side" },
    { n: "04", t: "Operate", d: "Local O&M, security, remote hands & 24/7 operations.", tone: "fg" },
    { n: "03", t: "Build", d: "Datacenter shells, liquid cooling, substations & fiber.", tone: "fg" },
    { n: "02", t: "Land & permits", d: "Site control, interconnection rights & environmental licensing.", tone: "fg" },
    { n: "01", t: "Power", d: "Generation & PPAs — the electron at the bottom of the stack.", tone: "energy", note: "the electron" },
  ],

  /* countries (three peers, no hierarchy) ------------------------ */
  countries: [
    { name: "Argentina", code: "AR", tag: "Wind & gas", framework: "RIGI · 30-yr stability", lead: "World-class wind and dispatchable gas under a 30-year investment regime.", sources: ["Wind", "Gas"],
      note: "Patagonian wind with capacity factors above 50% and Vaca Muerta gas for firm baseload, under RIGI's 30-year lock-in on tax, customs and FX stability." },
    { name: "Brasil", code: "BR", tag: "Hydro & renewables", framework: "~90% clean grid", lead: "The continent's largest power market, on a ~90% clean grid.", sources: ["Hydro", "Wind", "Solar"],
      note: "A hydro-led, ~90% clean grid and the largest power market in the region, with deep renewable capacity and tier-1 Atlantic connectivity." },
    { name: "Paraguay", code: "PY", tag: "Hydro", framework: "Maquila · Law 60/90", lead: "Among the cheapest clean baseload in the hemisphere.", sources: ["Hydro"],
      note: "Itaipú-backed binational hydro with institutional access to ANDE, under the Maquila and Law 60/90 regimes built for industrial load." },
  ],

  /* why south america -------------------------------------------- */
  why: [
    { h: "Power priced to move", d: "Itaipú hydro and Patagonian wind deliver clean energy at roughly half what the current compute hubs pay — abundant, renewable, and available today." },
    { h: "Behind the meter", d: "Generation co-located with load means direct PPAs and no public-grid latency — capacity that energizes on real timelines, not a future build cycle." },
    { h: "Built-for-industry frameworks", d: "Argentina's RIGI locks 30 years of fiscal, customs and FX stability; Paraguay's Maquila and Law 60/90 are purpose-built for industrial compute." },
    { h: "Demand that can't wait", d: "AI buildout is power-constrained today. Keraunos puts capacity where the cheap, clean electrons already are." },
  ],

  /* power sources ------------------------------------------------ */
  sources: [
    { t: "Hydro", d: "Itaipú-backed binational hydro — the cheapest clean baseload in the hemisphere.", tag: "Clean · firm" },
    { t: "Wind", d: "Patagonian capacity factors above 50% — among the best on the planet.", tag: "Clean · variable" },
    { t: "Solar", d: "High-irradiance corridors co-located with load.", tag: "Clean · variable" },
    { t: "Gas", d: "Vaca Muerta basin gas for dispatchable, firm baseload at scale.", tag: "Firm · dispatchable" },
  ],

  /* leadership (founders) ---------------------------------------- */
  team: [
    { name: "Daniel Velloso", role: "Founder & Managing Partner", img: "assets/daniel.png", li: "https://www.linkedin.com/in/daniel-velloso-68586a306/",
      bio: "Four infrastructure companies built since age 19 — including a US$20M+, 18 MW industrial compute campus in Paraguay. Energy origination, deal architecture and the cross-border capital behind Southern Cone compute." },
    { name: "Fabián Serravalle", role: "Co-Founder & CTO", img: "assets/fabian.png", li: "https://www.linkedin.com/in/fabian-s-8a258a268/",
      bio: "13+ years designing, executing and securing the region's most critical infrastructure — US$1B+ in cumulative project CapEx, YPF's main datacenter, and the first institutional compute operation in Vaca Muerta, run 100% on flare gas." },
  ],

  /* track record (founding team careers) -------------------------- */
  record: [
    { v: "US$1B+", k: "Cumulative project CapEx", d: "Critical energy and IT infrastructure designed, executed and secured across the founding team's careers — YPF's main datacenter, the Trans-Andean pipeline, the region's largest refineries." },
    { v: "18 MW", k: "Industrial compute built in Paraguay", d: "A US$20M+ buildout on Itaipú hydro — part of the first wave that proved Paraguay could host world-class compute, and the regulatory precedent today's AI rollout stands on." },
    { v: "8 MW", k: "Off-grid compute in Vaca Muerta", d: "The first institutional compute operation in the basin's history — 1,200 servers in extreme conditions, powered 100% by flare gas. Mission-critical standards from oil & gas, applied to compute." },
    { v: "100+ km", k: "Backbone fiber across oilfields", d: "Deployed during the early development of Vaca Muerta, alongside SCADA and automation modernizations in programs exceeding US$400M." },
  ],

  /* partners, principals & counsel ------------------------------- */
  partners: [
    { name: "Horacio Pino", org: "Engineering Principal · MEIP Ingeniería", note: "40+ years of gas, oil and thermal-generation engineering across Argentina." },
    { name: "Eduardo Meyer", org: "Brazil Energy & Sites · Kognos Energy", note: "Datacenter structuring, energy and site development across the Brazilian market." },
    { name: "Josh Murchie", org: "Partner & Advisor · Sympatheia", note: "Operator-led energy-to-compute infrastructure across LatAm and Asia-Pacific." },
    { name: "Luis Buffa", org: "Legal Counsel · CBVP Abogados", note: "Banking, financial and capital-markets law across MERCOSUR." },
    { name: "Guillermo Cervio", org: "Legal Advisor · Baker McKenzie", note: "One of Argentina's foremost technology and regulated-industries lawyers." },
  ],

  /* five ecosystems ---------------------------------------------- */
  ecosystems: [
    { n: "Energy", icon: "bolt", d: "Generation partners, PPA structuring and grid-interconnection rights across hydro, wind, solar and gas.", items: ["Generation & PPAs", "Interconnection rights", "Long-tenor offtake"] },
    { n: "Infrastructure", icon: "stack", d: "Site design and build — datacenter shells, liquid cooling, power distribution and dark fiber.", items: ["Datacenter EPC", "Liquid & immersion cooling", "Fiber & connectivity"] },
    { n: "Operator", icon: "wrench", d: "Local operators, EPCs and O&M teams that know the ground, the regulators and the labor.", items: ["Regional EPC network", "24/7 O&M", "Regulatory navigation"] },
    { n: "Finance", icon: "coin", d: "Project finance, equity and development capital — sovereign, DFI and strategic.", items: ["Project finance / SPVs", "DFI & sovereign capital", "Offtake-backed structures"] },
    { n: "Compute & demand", icon: "chip", d: "GPU supply, a managed cloud platform and the buyer relationships that anchor it all.", items: ["GPU clusters & fabric", "Managed cloud platform", "Capacity offtake"] },
  ],

  /* model comparison --------------------------------------------- */
  model: {
    layers: ["Power generation", "Grid & interconnection", "Land & permits", "Datacenter build", "Operations", "GPU compute", "Customer offtake"],
    cols: [
      { name: "CoreWeave",    own: [0,0,0,0,1,1,1] },
      { name: "Amazon (AWS)", own: [0,0,1,1,1,1,1] },
      { name: "Keraunos",     own: [1,1,1,1,1,1,1] },
    ],
  },

  /* economics of integration ------------------------------------- */
  economics: [
    { h: "Lower cost per token", d: "Power priced for decades, at roughly half what the current compute hubs pay. Energy runs 50–60% of project cost — and that gap flows straight to margin." },
    { h: "Margin captured at every layer", d: "We monetize the electron, the building and the GPU — not one thin reseller spread. Integration is the business model." },
    { h: "Delivery we control", d: "No interconnection queue, no landlord, no third-party uptime risk. One operator accountable end to end." },
  ],

  /* engagement --------------------------------------------------- */
  engage: [
    { who: "Compute buyers", steps: ["Scope capacity & timeline", "Diligence sites under NDA", "Contract reserved clusters"], cta: ["Request capacity", "mailto:daniel@keraunoscompute.com"] },
    { who: "Capital partners", steps: ["Review the thesis & pipeline", "Structure the vehicle", "Fund against contracted offtake"], cta: ["Investor inquiries", "mailto:daniel@keraunoscompute.com"] },
    { who: "Operators & partners", steps: ["Bring power, land or EPC", "Align on the build", "Deliver against aggregated demand"], cta: ["Partner with us", "mailto:daniel@keraunoscompute.com"] },
  ],

  /* who we work with --------------------------------------------- */
  worksWith: ["Hyperscalers & AI labs", "Infrastructure & energy investors", "On-the-ground operators & EPCs"],

  /* principles --------------------------------------------------- */
  principles: [
    { n: "Own the stack", d: "Every layer between the electron and the token, owned and operated. Integration is the moat." },
    { n: "Power first", d: "We start at generation. Everything else is built around the cheapest clean electron we can secure." },
    { n: "Local, not parachuted", d: "Built with regional operators, regulators and labor who know the ground." },
    { n: "Long tenor", d: "Decade-scale power, decade-scale relationships. We build assets, not trades." },
    { n: "Discreet by default", d: "Sites, capacities and counterparties stay under NDA. We protect the people we work with." },
  ],

  /* careers ------------------------------------------------------ */
  careersIntro: "We're building the team the next phase needs — senior, hands-on, and close to the assets.",
  roles: [
    { t: "Brazil Ground Team", loc: "São Paulo", type: "Building now" },
    { t: "Finance & Controllership", loc: "Multi-country", type: "Founding" },
    { t: "Commercial Origination", loc: "Remote · LatAm / APAC", type: "Founding" },
    { t: "Engineering & Operations", loc: "On-site · LatAm", type: "As sites build" },
    { t: "Country Manager", loc: "Argentina · Paraguay · Brasil", type: "Per market" },
  ],
};
