Grid connections in the crowded markets run two to eight years. Brazil's northeast has renewable generation already built, already licensed and already looking for load. We put the load there.
Existing halls carry the near-term fleet. Campuses on optioned power carry the scale. Neither waits for the other.
Tier III halls with energy, licences and connectivity already at the fence. We take capacity, retrofit it to AI rack density and liquid-ready cooling, and land clusters in months rather than years.
Purpose-built AI campuses on land and transmission we have optioned, sized to the generation next to them. Development, construction management and operations sit on one balance sheet.
Long-term supply contracted directly with generators, fixed or indexed, sized to a 24/7 AI load profile rather than a commercial one.
Coastal wind and solar in Ceará and Rio Grande do Norte, where built generation is curtailed for want of nearby load. Firmed to hold a training run steady.
Line options and land optioned ahead of construction, with gas backup on site so a campus is never one feeder away from an outage.
Load studies and queue positioning handled in-house, alongside the licensing that a converted hall or a new campus needs before it energises.
A preliminary framework over a multi-gigawatt Argentine renewable portfolio extends the same model beyond Brazil.
Supply and interconnection secured.
Hall taken or land closed, licences in hand.
AI rack density, liquid-ready cooling, one spec.
Fabric burn-in and acceptance before handover.
Run by our team, to the same standard fleet-wide.
We work with generators, landowners, colocation operators and infrastructure capital across Brazil and the Southern Cone.